by admin | Sep 30, 2024 | Downstream, Project
Client & Campaign Platforms & Surface Prep Total Area Completed PMA TCOT Crude Oil Tank T-442 & T-445 (2023) 1st Phase (4000m²) at 95% completion since Jan 2023 with 7-8 pax using light power tooling (St3). 2nd Phase (9000m²) across 4 tanks started...
by admin | Sep 30, 2024 | Downstream, Project
Client & Campaign Platforms & Surface Prep Total Area Completed PCFK Main Plant Gurun Conveyor X-6221 Phase 1 (2019 – 2020) HPWJ guns with a 10-pax team. 2000m² completed. 2000m² (target:...
by admin | Sep 30, 2024 | Downstream, Project
Client & Campaign Platforms & Surface Prep Total Area Completed PCFK Urea Export Terminal (UET) Phase 1 – 3 (2015 – 2018) Surface prep with HPWJ & Power Tooling. 8-10 pax B&P team, 2-3 guns in use consistently....
by admin | Sep 30, 2024 | Downstream, Project
Client & Campaign Platforms & Surface Prep Total Area Completed PETRONAS Penapisan Terengganu Sdn Bhd (PPTSB) KR1 & KR2 Pipeline & Shipping Area 2015 – 2019. On-going with St2 & St3 surface prep, no blasting allowed. Scope extended to other...
by admin | Sep 30, 2024 | Downstream, Project
Client & Campaign Platforms & Surface Prep Total Area Completed MLNG Module 1 & 3 Rotary Drum Screen 2017 – 2018. Completed with 2 B&P in 14 days with 40%-time savings. 1,400m²
by admin | Sep 25, 2024 | Downstream, Project, Project With Image
Area: UET & Main Plant Conveyor Belt System Total Surface Area: 23,000 m²: UET Phase 1–3 (2015–2019): 17,000 m² Main Plant Conveyor Belt System (2019): 6,000 m² Surface Preparation: Methods Used: High-Pressure Water Jetting (HPWJ) and St3 (hand and power tool...